English
magyar
Filipino
Nederlands
Italiano
Deutsch
Português
Español
Pусский
Français
العربية
简体中文

Home » News » Industry knowledge » sheet pile SCZ 16,SCZ 17N,SCZ 18N,SCZ 21N

sheet pile SCZ 16,SCZ 17N,SCZ 18N,SCZ 21N

Publish Time: 2018-07-20     Origin: Site

The sudden change of sheet pile geometry in SCZ 14 and SCZ 16 and SCZ 17N walls and the production of steel sheet piles wrapped in concrete. In order to improve the attachment of the product, the SCZ 21N interlocking room is cleaned with a steel wire brush and compressed air jet sheet pile manufacturers. If the SCZ 14 backfill starts before the SCZ14 installation, the initial deflection will occur. Wall. Therefore, due to the actual deflection, the calculation force in the pull-down rod will reduce the ratio and can not be cancelled.


Stress related cracking may occur under the heat load generated by hydration heat and environmental temperature effects. After determining SCZ 16 and T2, the penetration depth can be corrected by statics. However, it is wise to remember that the above SCZ21N method is only approximate. It is recommended that products be applied to shelters at ambient temperatures. SCZ16 interlock room should not have water, should not be coated.


After investigating the cracking of the I wall of the new Tiger Island, the following actions were recommended by SCZ14 and SCZ16, the Army Engineer's Waterway experimental station (WES). Part 2 of the impermeable sheet pile wall. Once polymerized, the product adheres well to the steel, and the surface of the polyurethane is smooth, allowing interlocking to slip easily during driving. If SCZ 18N rod is tilted, increase SCZ18N tension should be considered. If the wall has two or more layers of SZC17N pull rod, it is recommended to omit any reduction factor. The survey is restricted to the I wall with a thickness of 2 feet and an upper pole of 1 feet. Adhesion and measurement of steel (pull out test) were achieved through ProfilARBED study.

Steel sheet piles should be included in the geometry of SCZ 18N and SCZ 21N.


For more details, see Figure 9-1. Due to the introduction of the lower pull rod, the tension of the top pull rod is reduced to equal to that of the simple span. The single point load is equal to the tension of the lower SZC18N pull rod. The average consumption is about 0-15 litres per meter, or 90 feet per gallon per SCZ17N. The average productivity is about 200 meters, or 650 feet, every 8 hours.


Usually, the top of the sheet pile should be placed 9 inches below the SCZ 17N thickness of the concrete section, except for each end of the overall structure. The height of SZC 17N sheet pile wall driven by cohesive soil is limited by the initial strength of clay below the level of dredging line. The two sheet pile sections at both ends of the overall structure should be further lowered by 9 inches, placing these SCZ21N sheets below 18 inches of SCZ16 thickness variation. Therefore, the first step in the design of sheet pile walls in clayey soil should be the investigation of restricted height. In the construction site, the mixture of water SZC 18N and liquid soap is applied to the sealant to be lubricated before installation, so as to eliminate any risk of stripping. The SCZ 16 sheet pile at the integral joint should be cut to 9 inches above the bottom of the wall.


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 -13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!

Sheet piling for sale     About Us      Products       Technical Libirary       Certificates      Facilities       Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved  sheet piling prices