sheet pile PAU2250 PAU2240 PAU2260

Publish Time: 2018-06-19     Origin: Site

The PAU2240 sheet pile structure is made of PAU2250 element and connected through the slot and tongue. The anchor is the chain that leads to the anchor plate behind the structure. If the soil formed in the upper soil is weak, the walls will be anchored by inclined piles or piling frames. This manual is not full package sheet pile manufacturers. Other elements can be added separately or communicated to the contractors who clearly apply PAU2240.


The design of retaining wall should be able to bear the lateral earth pressure and water pressure, the influence of additional load, the weight of the PAU2250 wall and the earthquake load under the special circumstances in accordance with the general principles stipulated in this section. The purpose of this safety and health manual is to outline plans to prevent work related accidents.


This manual lists a number of elements that all contractors and subcontractors (each level) must include in their safety plan. Later, the PAU 2260 wall components were U steel sections, bolted and fixed on Z profiles. These elements combine higher stiffness and length, depending on the height of construction. Some contractors must incorporate other essential elements into their own safety plans when carrying out specific types of work.


Considering the potential long-term effects of material aging for each material component that constitutes the PAU 2250 wall, the sheet pile retaining wall should be designed according to PAU2260 or PAU 2240. The minimum life of permanent retaining walls should be 50 years. The contractor and every employee have the responsibility to ensure that they comply with all safety instructions required by the law, and their own safety plans include such compliance.


The invention of Larssen interlocking in 1904 is the initial driving force for the accelerated development of PAU2260 construction method. This method has not yet been completed. Nowadays, sheet pile structure is widely used in Wharf PAU 2240 walls. The role of construction safety management in the realization of construction safety and health includes the supervision of engineering safety. This function will not replace the contractor who takes precedence over the construction contractor, and the contractor will ultimately be responsible for the safety and health of his personnel and the protection of his property. The PAU 2240 quality of in-service performance is an important consideration for designing permanent retaining walls. The key function of construction safety management and PAU2260 construction safety and health is to supervise contractors to comply with the safety and health standards prescribed by law.


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 -13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!

Sheet piling for sale     About Us      Products       Technical Libirary       Certificates      Facilities       Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved  sheet piling prices