Publish Time: 2016-10-18     Origin: Three Points Should be Paid Attention to in Water - proof Cofferdam of Steel

For watertight steel sheet piles, the sealing requirements are very high. In order to ensure the sealing, piling usually use cotton wool, butter and other filler stuffing seams. However, the effect of doing so is not good, so the correct installation becomes particularly important.
Larsen steel sheet pile in the installation, the sealing side to note that these three points is very critical:
1、pumping along the joint sheet pile than the stem cells, hydraulic sand under the action of being sucked into the joints to achieve the purpose of blocking;
2、Secondly, some of the pump 1m deep to stop the time of reason, the use of pressure, the internal support, found in the time of leakage.
3、in strict accordance with the installation support, welding quality of the number of strict management design requirements.

CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 -13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!

Sheet piling for sale     About Us      Products       Technical Libirary       Certificates      Facilities       Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved  sheet piling prices