English
magyar
Filipino
Nederlands
Italiano
Deutsch
Português
Español
Pусский
Français
العربية
简体中文

Home » News » Industry knowledge » Steel Sheet Pile Locking Welding and Circular structure

Steel Sheet Pile Locking Welding and Circular structure

Publish Time: 2016-10-21     Origin: Steel Sheet Pile Locking Welding and Circular structure

Crimping and welding of Steel Sheet Piles locking
Two steel sheet piles can be crimped or welded together. Usually 3 to 4 crimp points per meter are required, and other forms may be used if desired. Each crimp point must be capable of withstanding a shear force of 75 n with an offset of less than 5 mm.
Sheet pile round structure:
The steel sheet pile can have a deflection angle of 5 in the absence of a corner pile. Enclose a circle. The maximum number of single cofferdams of AuPu, PJR and GU piles [5] is the approximate number of circular cofferdams enclosed by different types of steel sheet piles. Since the actual pinhole offset is related to the approximate minimum diameter of the long pile section and the minimum U-shaped pile data required for reference only. The use of curved corner piles can reduce the cofferdam and penetration depth and other factors, and thus the corrugated  steel sheet piles cofferdam diameters in the use of crimped or welded pile can increase the cofferdam diameter.

CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 -13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!

Sheet piling for sale     About Us      Products       Technical Libirary       Certificates      Facilities       Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved  sheet piling prices