English
magyar
Filipino
Nederlands
Italiano
Deutsch
Português
Español
Pусский
Français
العربية
简体中文

Home » News » Industry knowledge » SSAW steel pipe production precautions

SSAW steel pipe production precautions

Publish Time: 2021-08-18     Origin: Site

In the production process of SSAW steel pipe, a series of matters need to be paid attention to. In addition to the following test items, in accordance with API standards and other relevant standards and special requirements of some users, destructive tests on steel, steel pipes, etc. are required, including factory sampling of the physical and chemical properties of raw materials, and visual inspection of 100% steel.



A. Oiling mark: The qualified steel is oiled to prevent corrosion, and it can be marked according to user requirements.

B. Leveling and milling: The flat steel anvil machine is used to curl the original, and then the steel plate is milled on both sides by the milling machine to meet the requirements of plate width, plate edge parallelism and groove shape.

C. Shearing forming: roll the steel plate production line into a tube shape along the spiral outer edge.

D. Butt welding: The advanced double-sided submerged arc welding process is used for pre-welding, internal welding and external welding. Use plasma feet to cut welded steel pipes to specifications.


How to improve the stability of SSAW steel pipe?

After SSAW steel pipe is produced, it should be stored. If no measures are taken to maintain its stability, it will rust and corrode. So today we will talk about how to increase the stability of spiral welded pipes.


Generally speaking, we have adopted the following methods:

Small and medium-sized steel, wire rod, rebar, medium-diameter steel pipe, metal wire, steel wire rope, etc., can be stored in a well-ventilated shed, but the upper part of the cargo must be covered, and the lower part of the cargo must be covered with bedding. The bottom of the cargo.

Some small steel profiles, thin steel plates, steel strips, silicon steel sheets, small-diameter or thin-walled steel pipes, various cold-rolled or cold-drawn steels, and high-priced, corrosion-prone metal products. Store in a warehouse.

The floor or warehouse for storing spiral steel pipes should be clean and easy to drain. Keep away from factories and mines that produce harmful gases or dust. We also need to remove weeds and all debris to keep the steel on the ground clean.

Large-scale structural steel, steel rails, large-diameter steel pipes, forgings, etc. can all be piled up.

In the warehouse, SSAW steel pipes should not be stacked with materials that are corrosive to steel such as acid, alkali, salt, cement, etc. Different types of steel should be stacked separately to prevent confusion and contact corrosion.


Shunli Steel Group offers worldwide customers with one-stop services from pile design and selection, manufacturing, door-to-door transportation to guidance service forinstallation. Shunli has many different kinds of products, including U and Z sheet piles, omega sheet piles, pipe piles, tubular pipe piles, Combi walls, etc.No matter you are at the Palermo Port in Italy, Montoir Port in France, Baltimore in America, Gladstone in Australia or eventually various highways, railways, ports and canals inChina, it is easy to find the usage of Shunli Sheet Piles everywhere. The products have been used in over 60 countries and regions, and it has been a common view that if you need sheet piles, comes to Shunli to find it.


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 -13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!

Sheet piling for sale     About Us      Products       Technical Libirary       Certificates      Facilities       Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved  sheet piling prices