English
magyar
Filipino
Nederlands
Italiano
Deutsch
Português
Español
Pусский
Français
العربية
简体中文

Home » News » Industry knowledge » Larsen steel sheet pile construction process should pay attention to the details of what are the problems

Larsen steel sheet pile construction process should pay attention to the details of what are the problems

Publish Time: 2017-09-24     Origin: Larsen steel sheet pile construction process should pay attention to the details of what are the problems

Larsen steel sheet pile construction process should pay attention to the details of the problem:

1、the construction of the preparatory task: the pile should be inserted before the tip of the groove at the mouth of the mouth to prevent the soil squeeze into the mouth should be coated with butter or other grease. On the years off the repair, lock deformation, rusty steel sheet pile, should be refurbished correction, bending deformation of the pile, hydraulic jack can be used to pressure or fire baking and other methods to correct.

    

2、piling the waters of the division.

    

3、in the piling process. To ensure the verticality of steel sheet piles. With two theodens in the two bias to be controlled.

    

4、began to set one or two steel sheet pile position and bias should ensure accurate, so as to play the guiding effect of the model, so every 1m should be measured once, hit the depth of the bar immediately after the use of steel or steel purlin bracket Welding for temporary fixation.


Larsen steel sheet pile in water conservancy, waterway and other Larsen steel sheet pile use: function, appearance, the value of today's people choose to build information when used by the specification.


The sheet pile is in line with the above three points: the elements of its manufacturing components supply a simple and applicable structure, to meet all the requirements of structural safety and condition maintenance, and the use of steel piles to complete the construction has a great attraction.


The use of steel piles is extended and extended throughout the construction industry, from the use of traditional water conservancy and civil processes, as well as to the use of rail and trams to the improvement of environmental pollution.


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 -13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!

Sheet piling for sale     About Us      Products       Technical Libirary       Certificates      Facilities       Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved  sheet piling prices