English
magyar
Filipino
Nederlands
Italiano
Deutsch
Português
Español
Pусский
Français
العربية
简体中文

Home » News » Industry knowledge » How to Choose Which Larsen Steel Pile Driver Used in Larsen Steel Sheet Pile Construction

How to Choose Which Larsen Steel Pile Driver Used in Larsen Steel Sheet Pile Construction

Publish Time: 2017-04-10     Origin: 顺力钢业How to Choose Which Larsen Steel Pile Driver Used in Larsen Steel Sheet Pile Construction

Static pressure steel sheet piles pile driver has the advantage of no vibration, no noise, playing Larsen steel sheet pile length is long, you can pull any length of the Larsen steel sheet pile, you can play on the land pull Larsen steel sheet pile, Larsen steel sheet pile, can be relatively hard in the geological conditions of construction, the shortcomings are also playing Larsen steel sheet pile slow, high cost.

Knowing the advantages and determinations of the above three types of Larsen steel pile piles, we can choose which Larsen steel pile piles are used according to the characteristics of the Larsen steel pile piles. We chose the Larsen steel pile pile driver to meet the site of the construction conditions, to complete the completion of Larsen steel sheet pile drawing task. Second, we chose the Larsen steel pile pile driver to be the fastest to complete the Larsen sheet pile drawing task. Second, we chose the Larsen steel pile pile driver to the maximum limit to reduce construction costs, to avoid wasting expenses. Then we then according to the characteristics of Larsen steel pile pile driver, combined with the site conditions, according to the site to choose Larsen steel pile pile driver.

1、see the size of Larsen steel sheet pile project size, need to pull the number of Larsen steel sheet pile.

2、to see Larsen steel sheet piles engineering geological conditions, combined with geological conditions to choose the most suitable steel pile pile piling machinery for the construction to provide more convenience.

3、to see the progress of the project, the choice of Larsen steel pile pile piling machinery, we must be able to fully meet the needs of the progress of the project.

4、look at the construction environment, in the choice of Larsen steel pile pile driver, do not forget to choose to meet the operating environment for noise and vibration and other pollution control requirements of the equipment, can not ignore the scene of the traffic terrain and scaffolding distribution, but also pay attention Larsen steel sheet pile piling machine station and the need to pull Larsen steel sheet pile construction point distance.


Then we have to give an example of how to choose the use of Larsen steel sheet pile piling in the construction of Larsen steel sheet pile. Example 1: Wuhan municipal pipe network project, length of 2 km, use 9 m 3 type Larsen steel sheet pile Pull the Larsen steel sheet pile 10000, the construction progress is high, the geological sand, silty clay, no obstruction around the barrier, in which case you can use the robot Larsen steel pile pile driver to construction.


Example 2: Wuhan, a bridge project, cofferdam size of 25 meters * 10 meters, the use of 21 meters 4 Larsen steel sheet pile, need to pull Larsen steel sheet pile 175, geological clay, the distance between the need to pull the Larsen steel sheet pile Distance, in this case to use the crawler hanging vibration hammer to pull the Larsen steel sheet pile, or can also static pressure plate pile pile driver to construction.


Example 3: Wuhan City, a pipe network project, the length of 500 meters, the use of 9 meters 3 Larsen steel sheet pile, need to pull Larsen steel sheet pile 2500, construction progress is high, geological sand, silty clay, (1 meter or so), in this case requires no noise, no vibration, you need to use static pressure plate pile pile driver to construction.


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 -13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!

Sheet piling for sale     About Us      Products       Technical Libirary       Certificates      Facilities       Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved  sheet piling prices