   admin@shunlisteel.cn        +86 13739192886 
Home » News » Industry knowledge » ​SCU16,SCU18,SCU20,SCU23,SCU25 Thyssen Krupp Steelcom sheet pile

​SCU16,SCU18,SCU20,SCU23,SCU25 Thyssen Krupp Steelcom sheet pile

Views: 24    

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

In group SCU16 and SCU18 and SCU23 SCU20 will be assembled according to the manufacturer's instructions in the use of maintenance of Queensland manufacturing system. This can be achieved by limiting the vertical single board size and vertical spacing of soil reinforcement level, and by requiring SCU18 panels to have enough vertical sliding SCU16 between adjacent panels. Three methods are usually used to install Contech Bin-Walls to a specific curvature. A copy of these instructions is provided on the scene for reference.


Design of welding wire sheet pile manufacturers , wire mesh or similar panel should prevent compaction due to SCU20 stress or backfill weight lead back surface layer element and lead to excessive bulging compression backfill. Generally speaking, it is more economical to use standard parts and avoid Thyssen Krupp on-site manufacturing. The top of the flexible panel at the top of the wall should be connected to a layer of soil reinforcement to provide SCU23 stability for the top panel. Any use of the falling protection system will comply with the Washington DOSH regulation contained in the WAC 296-155 C-1 part. The vertical wall is almost always easier to build on the curve, and should be considered as the preferred replacement wall for SCU25 pile. The maximum vertical spacing of soil reinforcement connected to the panel is equal to 20 inches of the permanent wall and 30 inches of the temporary wall.


The Thyssen Krupp clearance interval between SCU25 and SCU 16 soil SCU 18 strengthening elements should be 12 inches. More details of our SCU method Contech sales engineers can provide the following 16 methods 1 methods using special 1 boxes in the front or rear wall using shorter than the standard beam. For the welding surface plate, wire size should be W8 for permanent walls, W6 used for temporary walls, vertical wires maximum center spacing should be 6 inches, the level of the wire spacing should be 9 inches. It is necessary to have SCU 18 anchor point to withstand 5000 pound impact unless the deceleration device falls to 2 large piling feet under the limitation of usage, in which case 3000 pound anchorage can be used. By changing the length of the short beam, can create a wide variety of configurations.


Grand Piling SCU 20 must place SCU 23 or SCU 25 to prevent wear from West Australia Fremantle. As the vertical displacement increases with the increase of the height of the wall, the height limit is an important consideration for SCU 25. The hook may not be connected to each other, or it may not be connected to the web ring. On the wall is 1:6 batter condition, this method will lead to 20 SCU on the wall slope change slightly, which limits the amount of special garbage in Queensland can use the. Secondary panels should be provided to prevent the loss of backfill material through the panel. Check whether the components are deformed, worn and mouldy.


SectionDimensionsSectional AreaMassMoment of inertiaModulus of section


WidthHeightThicknessPileWall



wht/s





mmmmmmcm2/mkg/mkg/m2cm4/mcm3/m
SCU7750320571.3425610725670
SCU8750320686.75168.113169823
SCU97503207101.459.779.615251953
SCU116003608131.461.9103.2198971105
SCU126003609147.369.5115.8222131234
SCU1360036010162.476.5127.5244911361
SCU166504808138.571.3109.6398641661
SCU186504809156.179.5122.3445211855
SCU206505408153.778.1120.2560022074
SCU236505409169.487.3133610842318
SCU2565054010187.496.2146.9690932559


CONTACT US TODAY!

Related Products

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086-13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved sheet piling prices