Views: 122
The maritime pontoon bridge in Mombasa, Kenya has been completed and opened to traffic. All the steel pipes and steel structures are manufactured in China by Shunli. Shunli has joined hands with a central enterprise to jointly create a model project of a maritime pontoon bridge. This pontoon bridge has greatly facilitated the travel of local residents in Mombasa, Kenya, triggering extensive shockwaves locally. The pontoon bridge takes into account both the convenience of pedestrian access and the need to ensure uninterrupted shipping navigation, with ingenious design.
After the completion of the project, transportation between Mombasa's main urban area and the Mombasa Station of the Mombasa-Nairobi Railway will be more efficient and convenient, which is conducive to the Mombasa-Nairobi Railway better serving the people in Kenya's coastal areas. At the same time, the project will achieve the interconnection of the waters around Mombasa's main island through offshore dredging, which will play a role in promoting regional environmental protection and tourism development.
After the unveiling ceremony of the Likoni pontoon bridge in Mombasa, President Kenyatta personally experienced the bridge. The Likoni pontoon bridge project is an important emergency project for Kenya's epidemic prevention and control. China Road and Bridge Corporation overcame the pressure of epidemic prevention and efficiently organized project construction, completing the project in just five months. The pontoon bridge is 660 meters long in total, connecting Mombasa's main island and the southern coast area, and can meet the daily passage of 300,000 person-times. After its completion, it will greatly relieve the traffic and epidemic prevention pressure of Likoni ferry.