Analysis on Construction Scheme of Larsen Steel Sheet Pile

Views: 3    

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Larsen steel sheet pile in the construction industry is very convenient, Larsen steel sheet pile itself has a high superiority, it as a new type of building materials, in all industries have applications, then in the application process Larsen steel sheet pile construction program how should I do it? Here we look at the next look at it


Larsen steel sheet pile project is actually a temporary support structure, can be made in accordance with the requirements of the design, so that the structure of concrete structures in accordance with pre-designed location and size to maintain a certain shape. Only the position to keep fixed, so as to be able to withstand the weight of the template itself and the steel sheet pile in the above load.


From the production of steel sheet pile to the installation, the user does not need to prepare the material, through the steel sheet pile construction personnel tight organization, construction speed faster. In the field operation, there is no wet operation, more in line with the needs of modern engineering development. Prefabricated fences are environmentally friendly and removable, and can be used repeatedly. Steel sheet pile project in the current construction, in the organs of institutions, the city's green walls, enterprises and institutions are applicable.


The purpose of the Larsen steel sheet pile project is to ensure the quality of the project and the safe construction, to speed up the construction progress and to minimize the project cost.


Larsen steel sheet pile length of 6m, 9m, 12m, 15m, 18m, etc., Larsen steel sheet pile in the application has a strong durability. Steel sheet cofferdam construction progress is relatively fast, the application of more secure and small footprint, you can use many times, cost savings.


Larsen steel sheet pile construction program is mainly determined from the actual situation of the site, we have to arrange according to the actual situation.


First of all to consider the selection of Larsen steel sheet pile type, is to choose a moderate width, good bending performance Larsen type steel sheet pile or ordinary simple steel sheet pile.


Second, the piling equipment, select a few piling equipment into the steel sheet pile pull in time and money to achieve the best results.


In addition, we have to take into account the problems encountered in the construction, such as steel sheet pile has been leaked, steel pile pile piling and so on.


Finally, in the pile of the pile, the pile process sometimes encounter large pieces of stone or other unknown obstacles, resulting in steel sheet pile into the depth is not enough, the use of corner pile or curved pile around the obstacles.


CONTACT US TODAY!

Related Products

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086-13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved sheet piling prices